The foundation has to sit for two weeks before the framers can start. In the mean time we're reviewing some things that we've been talking about with Dave and beginning to make some decisions on finishes.
Some things that we're going to do:
Add permanent escape ladders to one of the 2nd floor bedrooms and the bonus room.
Add a gravitational hot water loop so that we will have hot water as soon as we turn on the faucet, even on the 2nd floor.
Add network cabling to most of the rooms in the house, including the garage.
Place under-cabinet outlet strips in the kitchen so there are no outlets on the walls.
We're also trying to decide what the hearth room wall with the fireplace will look like.
And finally, we've decided to go with a geothermal "ground-to-air" heat pump for heating and cooling. As a side benefit, there is an adapter to push excess heat into the water heater to reduce the cost of heating that as well.
Wednesday, December 19, 2007
Thursday, December 13, 2007
Foundation
Not only did they put the forms up on Wednesday, they also poured the foundation on Wednesday as well. I'm not sure how long the foundation has to set before we can move on to the next stage but Dave told us that as soon as the foundation is poured he's going to have us start making some decisions. I can't wait!
Monday, December 10, 2007
Snow, Snow, Snow, Snow
It snowed 4 inches Thursday and it's going to snow about the same amount tonight. It's was also about 10 degrees out this morning. Dave said that the plan is to put the foundation forms up on Wednesday and pour on Thursday. In order to offset the longer set time in the cold, they will add calcium chloride to the mix. I've done a little reading on this just to see what the effects of adding this are. Apparently the concrete has the same strength with this as without, it just sets faster.
Let's hope that the weather holds out after tonight so that they can do the work needed later in the week.
Let's hope that the weather holds out after tonight so that they can do the work needed later in the week.
Thursday, December 6, 2007
My, What Big Feet You Have
The footings were dug and poured yesterday. It's kinda neat to see their placement as it compares to the houseplan. All those squares and circles are starting to make sense now.
They covered the footings with hay, I'm guessing to help keep them warm until they dry.
To add to the fun, it snowed about 4 inches today. I have no idea what this will mean for the foundation guys as I havn't talked to Dave to ask him.
More pictures on Flicker that you can link to from the right.
They covered the footings with hay, I'm guessing to help keep them warm until they dry.
To add to the fun, it snowed about 4 inches today. I have no idea what this will mean for the foundation guys as I havn't talked to Dave to ask him.
More pictures on Flicker that you can link to from the right.
Wednesday, November 28, 2007
Compacted Soil
Went out to the lot today and watched them compact the new dry soil. The engineers have been measuring the compaction rates and are very pleased with the results. They want a measurement of 90 and are consistently getting over 105.
I have no idea what that is but they are very happy with it.
It was 36 degrees when I was out there at Noon. Hopefully the weather holds out so that the footings can be poured this week.
I have no idea what that is but they are very happy with it.
It was 36 degrees when I was out there at Noon. Hopefully the weather holds out so that the footings can be poured this week.
Tuesday, November 27, 2007
That's What She Said
The diggers scooped out 4 feet of wet goop from the already existing hole and found that the earth was hard underneath. This is excellent because it means that we will be starting with a solid base on which to lay the dry soil on. As they lay the soil and compact it, an engineer will do a compaction test at each foot to make sure all is as it should be. Once this is complete, a final analysis will be done to determine if there is still a need for spread footings and additional tile work. If not, the overall improvement costs will not be as high as first estimated.
Tomorrow they should be done with filling and the foundation guy can begin the work of pouring the footings and then the foundation.
Tomorrow they should be done with filling and the foundation guy can begin the work of pouring the footings and then the foundation.
Wednesday, November 21, 2007
Happy Thanksgiving
What a great way to go into the Thanksgiving holiday! The new engineering firm finished their research on our lot and said that they could find no plausible cause for the water other than the pond. They said that this area of the development was a "cut" or high area (as opposed to a low area that was filled.) The development company has authorized them to reconstruct the pond with an impermeable liner in the spring.
There will need to be a few things done to improve the excavation so that it can be built on. Part of this is replacement and compaction of dry soil. Another part is to use a spread footing and a more extensive tile system as insurance.
We have asked our builder to find out what assurances we will have, preferably in writing, that if we have water problems in the future that the developer will take care of them.
As long as the answer to this is acceptable, work will begin on the foundation on Monday.
Yea!
There will need to be a few things done to improve the excavation so that it can be built on. Part of this is replacement and compaction of dry soil. Another part is to use a spread footing and a more extensive tile system as insurance.
We have asked our builder to find out what assurances we will have, preferably in writing, that if we have water problems in the future that the developer will take care of them.
As long as the answer to this is acceptable, work will begin on the foundation on Monday.
Yea!
Friday, November 16, 2007
Engineers Galore
Our builder had a meeting with the land development company on Wednesday. They are going to hire another geotech engineering firm to do a comprehensive study of the lot and determine definitively if it is the pond that is causing the wetness. If it is, they will either fix the pond or they will fill it in. They have also offered to pay half of what the cost of what the additional waterproofing will be on the house.
As I stated before, if it turns out that it's not the pond and it's a water table or natural spring, we'll have to locate another lot.
Sigh.
As I stated before, if it turns out that it's not the pond and it's a water table or natural spring, we'll have to locate another lot.
Sigh.
Wednesday, November 14, 2007
Wait...Some More
Well, we still have nothing more than a hole in the ground. And one section of it is still damp. Our builder, Dave, is in the process of working with the land development company to see what help they are going to provide.
I'm hoping that we hear back today about stuff but I'm not holding my breath. I just hope that we get something resolved this week.
If we stick with this lot (that's right, there's a possibility of moving to a 3rd lot) we'll have to do quite a bit of work to make sure that some time in the future we don't get water in the basement or have settlling problems with the foundation. The engineers say that they can engineer around this and make sure the house is ok but it will just cost money.
The biggest thing that I'm concerned with is that if we have to fork over more money for waterproofing we won't be able to do the Geothermal (or ground-to-air heat pump as it's called).
As Dave has told me, "A week won't make us but it could certainly break us." Meaning that taking a week longer up front to do thing right won't hurt us but if we don't take the time now, we may end up paying for it in the long run.
I'm hoping that we hear back today about stuff but I'm not holding my breath. I just hope that we get something resolved this week.
If we stick with this lot (that's right, there's a possibility of moving to a 3rd lot) we'll have to do quite a bit of work to make sure that some time in the future we don't get water in the basement or have settlling problems with the foundation. The engineers say that they can engineer around this and make sure the house is ok but it will just cost money.
The biggest thing that I'm concerned with is that if we have to fork over more money for waterproofing we won't be able to do the Geothermal (or ground-to-air heat pump as it's called).
As Dave has told me, "A week won't make us but it could certainly break us." Meaning that taking a week longer up front to do thing right won't hurt us but if we don't take the time now, we may end up paying for it in the long run.
Monday, October 29, 2007
Water in the Hole
As I mentioned in my last post, when they dug the hole, the bottom of it was rather wet. Dave went out there this morning with a geotech engineer to look at it. They took a soil sample and looked over the entire layout. From the sounds of it, the engineer wasn't overly concerned. He's going to write up a report and get it to Dave by tomorrow morning with his recommendation. Dave believes that it may be the frog pond behind our lot that may be the source of the water. He talked with the land development company about it and they are "extremely receptive to assist in any way they can." They are going to send out their engineering firm tomorrow or Wednesday to assess the lot, the pond, etc. to determine what the problem might be and what they can do to remedy.
Even between yesterday and today the ground had dried out noticibly. So in the mean time, we're going to let the ground dry out and wait.
Even between yesterday and today the ground had dried out noticibly. So in the mean time, we're going to let the ground dry out and wait.
Sunday, October 28, 2007
Holy Excavated Dirt, Batman!
The permits from the city came in earlier than they had said so Dave fired the start gun and things are off and running. The excavators were suppsed to start digging either Thursday or Friday but they had problems with one of their pieces of equipment. Fortunately, the owner of the company said that he'd come out and dig the hole on Saturday.
We went out and watched him dig for a little while and then came back when he was finished. We noticed that the bottom of the hole had ruts from the Catapiller about 1 1/2 feet deep. He said that he actually had gotten stuck at one point and had to rock himself out.
He's not sure why it was so wet. He's recommending that we get the soil tested, which will delay pouring the footings. Surprise, another delay. Hopefully it won't be too long and they'll be able to get the foundation poured next week. Keep your fingers crossed.
We went out and watched him dig for a little while and then came back when he was finished. We noticed that the bottom of the hole had ruts from the Catapiller about 1 1/2 feet deep. He said that he actually had gotten stuck at one point and had to rock himself out.
He's not sure why it was so wet. He's recommending that we get the soil tested, which will delay pouring the footings. Surprise, another delay. Hopefully it won't be too long and they'll be able to get the foundation poured next week. Keep your fingers crossed.
Monday, October 22, 2007
Stakes Anyone?
Today the surveyors were due on the lot to stake out the house. Dave got to the lot a little bit after they were supposed to be there and found that they had come, done their thing, and left already.
Dave looked everything over and it all looks good. He explained what all the markings on the stakes meant and what the result of the survey was. The good news is that the front/side of the house will have 7 feet of the foundation exposed so we can have a daylight basement on that side of the basement. The driveway will rise a height of 3 feet by the time it reaches the house.
I posted some pictures of the lot with the stakes on it.
Dave looked everything over and it all looks good. He explained what all the markings on the stakes meant and what the result of the survey was. The good news is that the front/side of the house will have 7 feet of the foundation exposed so we can have a daylight basement on that side of the basement. The driveway will rise a height of 3 feet by the time it reaches the house.
I posted some pictures of the lot with the stakes on it.
Monday, October 15, 2007
Cabinet Doors
We've been tasked to pick out the design of the cabinet doors for the kitchen. Once this decision is made, 1 door will be ordered and given to the interior decorator. From that door, and an interview, she'll know our style and begin shopping for elements of the house. So, no pressure on this decision.
We are going with Crystal Cabinets. As I've stated before, we're going for a "Craftsman Style" house. Based on that, Dave the builder (no relation to Bob) suggested that we avoid miter cuts (45 degree joints) and stick with box cuts (90 degree cuts). Along with the door design, we need to decide on wood and color. We like the look of both the Red Oak and the Alder, which is convenient because those are both the least expensive woods available (inexpensive, not cheap, is our motto.) If you look at the featured home on Thomas David's web site, the kitchen cabinets in that house are Alder.
image 1
image 2
image 3
We are going with Crystal Cabinets. As I've stated before, we're going for a "Craftsman Style" house. Based on that, Dave the builder (no relation to Bob) suggested that we avoid miter cuts (45 degree joints) and stick with box cuts (90 degree cuts). Along with the door design, we need to decide on wood and color. We like the look of both the Red Oak and the Alder, which is convenient because those are both the least expensive woods available (inexpensive, not cheap, is our motto.) If you look at the featured home on Thomas David's web site, the kitchen cabinets in that house are Alder.
image 1
image 2
image 3
Thursday, October 11, 2007
Ready...Set....GO!
We closed on the construction loan yesterday afternoon. The new lot is paid for so Dave was able to get the survey. He ran over this morning to apply for the permits. Right now they estimate 3 weeks for the permits to be issued. In the mean time, the surveyers can get out to the lot and stake the borders. Dave will also be able to figure out the elevation of the house. The land slants from the back 186th street-side corner down to the front Nina street-side corner. Hopefully this will mean that we can have a side-daylight basement window.
We were excited during the signing of the documents all the way up to the "Truth in Lending" document. That's the one that says how much money you'll have paid the bank at the end of your loan. Wow! I really didn't need to know that number.
We were excited during the signing of the documents all the way up to the "Truth in Lending" document. That's the one that says how much money you'll have paid the bank at the end of your loan. Wow! I really didn't need to know that number.
Tuesday, October 2, 2007
Assessment Finally In
The bank's assessment of the plan finally came back today. We were hoping that it would be more than 5% of what the cost was so that we don't have to bring any money to the closing. The final number came back in at almost $30,000 above cost so we are well above the number that we needed.
That is such a relief. Now we can continue to squirrel our money away in savings so we have that much more to add to the down payment.