Monday, October 22, 2007

Stakes Anyone?

Today the surveyors were due on the lot to stake out the house. Dave got to the lot a little bit after they were supposed to be there and found that they had come, done their thing, and left already.
Dave looked everything over and it all looks good. He explained what all the markings on the stakes meant and what the result of the survey was. The good news is that the front/side of the house will have 7 feet of the foundation exposed so we can have a daylight basement on that side of the basement. The driveway will rise a height of 3 feet by the time it reaches the house.
I posted some pictures of the lot with the stakes on it.

No comments: