That's What She Said

The diggers scooped out 4 feet of wet goop from the already existing hole and found that the earth was hard underneath. This is excellent because it means that we will be starting with a solid base on which to lay the dry soil on. As they lay the soil and compact it, an engineer will do a compaction test at each foot to make sure all is as it should be. Once this is complete, a final analysis will be done to determine if there is still a need for spread footings and additional tile work. If not, the overall improvement costs will not be as high as first estimated.
Tomorrow they should be done with filling and the foundation guy can begin the work of pouring the footings and then the foundation.